We do a lot of cleanout installations. The following is one example of a project.
Freedom Underground Plumbing installed a new property line cleanout located approximately 2 to 5 feet before the city sidewalk area. We installed the cleanout required by the codes and specifications of San Jose. Once the work was complete, we called in for inspection and notified the client on the dates and times. After inspection had passed, we placed 3/4 river rock at the bottom of the pipe and backfilled with native soil to seal the job.